Description
AEC FERRUS SP online double-conversion UPS — 10 kVA / 10 kW, split phase 120/240 V.
Battery: 16 × 12V 9Ah internal plus BB4US external cabinet with 32 × 12V 9Ah (3 parallel strings on the 192 Vdc bus, 48 batteries total).
Runtime: 56 min at 25% load, 30 min at 50%, 17 min at 75%, 13 min at 100%.
Technology: 3-level IGBT; unity power factor (kVA = kW); isolation transformer and maintenance manual bypass integrated; 8 A settable charger.
Efficiency: up to 94%. Output terminal block for hardwire installation.
Comms: RS232 + EPO + USB standard.
Warranty: 2 years.





Reviews
There are no reviews yet.