Radiant-IB 100kVA

AEC RADIANT-IB modular UPS (N+X) — 100 kVA / 100 kW configured.
Architecture: 5 × 20 kVA hot-swappable power module(s) in a 100 kVA / 100 kW frame (scalable to 5 modules / 100 kVA); parallel up to 8 units.
Technology: 3-level IGBT; unity power factor (kVA = kW); 40 A settable charger.

$79,572.00

Description

AEC RADIANT-IB modular UPS (N+X) — 100 kVA / 100 kW configured.
Architecture: 5 × 20 kVA hot-swappable power module(s) in a 100 kVA / 100 kW frame (scalable to 5 modules / 100 kVA); parallel up to 8 units.
Technology: 3-level IGBT; unity power factor (kVA = kW); 40 A settable charger.
Input / Output: 208/120 V three-phase.
Battery: internal hot-swappable VRLA, up to 240 × 12V 9Ah (240 pcs).
Efficiency: up to 94%.
Display: 7-inch colour touchscreen.
Comms: RS232 + EPO + USB standard.
Warranty: 2 years.

Additional information

Series

RADIANT-IB

Family

RADIANT-IB

Power

100kVA

Technology

Modular N+X Online DC

Form factor

Modular

AC configuration

208V 4W (3P+N)

Voltage

208V · 3Ph

Power factor

1

Efficiency

up to 94%

Battery

VRLA · Internal Tray System

DC bus

240 Vdc

Warranty

2 years

SNMP card

SNMP-M

Runtime (minutes at % load)

2%: 480 min · 4%: 220 min · 5%: 185 min · 6%: 145 min · 8%: 110 min · 10%: 85 min · 12%: 65 min · 14%: 55 min · 15%: 50 min · 16%: 45 min · 18%: 38 min · 20%: 32 min · 24%: 30 min · 25%: 30 min · 28%: 24 min · 30%: 22 min · 32%: 19 min · 36%: 16 min · 40%: 14 min · 42%: 14 min · 45%: 14 min · 48%: 12 min · 50%: 12 min · 54%: 10 min · 56%: 10 min · 60%: 8 min · 64%: 8 min · 70%: 8 min · 72%: 7 min · 75%: 7 min · 80%: 6 min · 90%: 4 min · 100%: 3 min

Reviews

There are no reviews yet.

Be the first to review “Radiant-IB 100kVA”

Your email address will not be published. Required fields are marked *

related products

SKU: AUR30-80X9A . ,

AEC AUREON 30 kVA UPS — three-phase, online double conversion.
Output: 30,000 VA / 30,000 W (unity power factor, kVA = kW).
Input / Output: 208 V three-phase.

$32,626.00

SKU: AUR20-60X9A . ,

AEC AUREON 20 kVA UPS — three-phase, online double conversion.
Output: 20,000 VA / 20,000 W (unity power factor, kVA = kW).
Input / Output: 208 V three-phase.

Price range: $26,396.00 through $28,068.00

SKU: FERSP10000-16X9+BB4US-32X9 . ,

AEC FERRUS SP online double-conversion UPS — 10 kVA / 10 kW, split phase 120/240 V.
Battery: 16 × 12V 9Ah internal plus BB4US external cabinet with 32 × 12V 9Ah (3 parallel strings on the 192 Vdc bus, 48 batteries total).
Runtime: 56 min at 25% load, 30 min at 50%, 17 min at 75%, 13 min at 100%.

Price range: $10,331.00 through $14,344.00

SKU: FERSPRT6000-16X9+BAT16192RT . , Brand:

AEC FERRUS SP 6 kVA split-phase online double-conversion UPS — 19-inch rack.
Output: 6,000 VA / 6,000 W (unity power factor, kVA = kW).
Input / Output: 120 / 240 V split-phase (2-phase).

Price range: $5,533.00 through $11,730.00